Planning And Resource Scheduling Of Residential (G+18) Project Using Primavera.

₹ 3,000.00 — 5,000.00 INR
It is fair to assume that the ultimate object of an Enterprise is to make profits and to satisfy the
consumption needs of the community.
This involves a wide range of economic resources.
At the heart of using
resources deployed to produce the desired outputs is Productivity.

In its widest sense, the productivity concept refers to the relationship between the economic resources used in
production and the resultant output of goods and services.
To be more productive is to obtain a larger output from a
given input of resources.
In this sense, productivity signifies economic performance or efficiency.
An increase in
productivity means higher incomes for shareholders, managers, workers and the community.
Through its effects on cost
of production, productivity determines the competitive capacity of the firm, industry and economy as a whole.

There is consensus on the need to improve productivity but little agreement on the causes and problems and what to do
about it.
Two common sources of confusion about productivity may be referred to here briefly.
One relates to the
meaning of productivity for the firm as distinct from productivity of individual inputs - labour, machines etc; and the
other concerns the measurement of productivity.

Productivity in the economic sense does not refer to any combination of resources but essentially to that combination
which conforms most closely to a firm's desired outputs. , say from plant to labour, or from one project to another,
could result in an increase in the physical volume of output, or in technical efficiency of production, but the economic
performance of the firm may deteriorate.
That could not be called productivity.
Productivity therefore, refers to the
collective output of all individual resources of a firm.

Similar Freelance jobs:

Master Thesis - Microsoft Word -- 2
I need someone to help me finish my master's thesis. The job is about retrofitting coupling beams using FRCM (fiber-reinforced concrete matrix). I have been working on it for two years and all the experiments are done. I need someone to help me finish the writing task.
Full Description of Master Thesis - Microsoft word -- 2
Civil Draftsman 3d Designer
Hi sir, how are you? Sir, I am a Civil Draftsman 3D designer. I have an employment visa.I have 4 years experience in the UAE. I worked on many projects as site supervisor. check my CV Portfolio thanks
Full Description of Civil Draftsman 3D Designer
Blueprint Modelling
Good afternoon. I have a blueprint for a house, which needs to be modelled modelled into 3D via ArchiCAD or Revit with basic details (furniture/decor), hence I am looking for freelancer who could do the job. Thanks in advance
Full Description of Blueprint modelling
Dillon House
I have a set of plans but need the house to be increased in size of 3ft front and 3ft back. I would like to keep all of the structure the way it is except for size.
Full Description of Dillon House
Grading And Engineering Plan
This project is to design a grading and engineering plan and establish elevations for a homesite on a hillside.
Full Description of grading and engineering plan
Architectural Drawings
I require a freelancer who can provide me with architectural services, for the construction of an hotel plan.
Full Description of Architectural drawings
Build Me An Analysis In Midas
Midas Civil is a Finite Element Analysis software developed by MIDAS IT, used for bridge structural analysis and design.
Full Description of Build me an analysis in MIDAS
© 2006 — 2026 hirelancer.com is an affiliate website, listing the freelance projects. We are collaborating with other sites like getFreelancer.com. Feel free to bid on any project and good luck! You will need register first, before bidding or posting projects. Basic memberhsip is always free. We might earn commissions from referring you. You will never ever pay additional fees for we referred you.