Monthly Log Reports Creation (Windows' event file)
Budget: $30 – $250 USD
Job Description: Proposal and demonstration of a method to create monthly log reports (any method can be used, provided the most efficient method is proposed).
Requirements:
・Target OS: Windows
・Report Data Format: Windows Event File
・Target Days: Monday to Friday, excluding Japanese public holidays
・Target Standard Time: JST (Japan Standard Time)
・Log Start and End Times: We will provide data with specified times each month. For each day, a 1-10 minute deviation from the specified time should be recorded and reflected in the log. The method for achieving this is flexible.
・Target Logs: Log entries for sign-in, sign-out, and activities confirmed within a certain range between the start and end times. This can include app launch logs or logs for specific processes as long as activity data can consistently be collected within the specified time frame.
・Tools and Commands: Any tool or command can be used (batch scripts, cloud synchronization tools, etc., are all acceptable as long as requirements are met).
・Number of Logs: Initially, collect logs for one person to assess feasibility. However, the proposed method should incorporate elements of automation and efficiency, as it is intended for potential use with logs for up to 40 people.
・Storage Location: Either local or cloud storage is acceptable.
Proposal Selection Process:
1.Review of proposed content.
2.Execution request.
3.Confirmation of execution results
Requirements:
・Target OS: Windows
・Report Data Format: Windows Event File
・Target Days: Monday to Friday, excluding Japanese public holidays
・Target Standard Time: JST (Japan Standard Time)
・Log Start and End Times: We will provide data with specified times each month. For each day, a 1-10 minute deviation from the specified time should be recorded and reflected in the log. The method for achieving this is flexible.
・Target Logs: Log entries for sign-in, sign-out, and activities confirmed within a certain range between the start and end times. This can include app launch logs or logs for specific processes as long as activity data can consistently be collected within the specified time frame.
・Tools and Commands: Any tool or command can be used (batch scripts, cloud synchronization tools, etc., are all acceptable as long as requirements are met).
・Number of Logs: Initially, collect logs for one person to assess feasibility. However, the proposed method should incorporate elements of automation and efficiency, as it is intended for potential use with logs for up to 40 people.
・Storage Location: Either local or cloud storage is acceptable.
Proposal Selection Process:
1.Review of proposed content.
2.Execution request.
3.Confirmation of execution results