New Fiber Connection Installation Needed
Budget: ₹12,500 – ₹37,500 INR
I need an experienced fiber technician to perform a complete, ground-up installation of a brand-new fiber line. This is a fresh connection—no old cable to pull out and no network to extend—so the job covers everything from initial site survey through final hand-off at the destination facility.
Your scope will include pulling and securing the cable, splicing, fitting all hardware, and running full certification tests. Please come equipped with your own fusion splicer, OTDR, power meter, and standard safety gear. Unless we agree otherwise, you will also supply the fiber, connectors, patch panels, trays, labels, and any mounting hardware.
Deliverables
• Fully installed single-mode fiber link, ready for service provider activation
• OTDR and optical power test reports (PDF)
• As-built diagram showing route, splice points, connector types, and labeling scheme
Acceptance Criteria
• Insertion loss ≤ 0.3 dB per connector and ≤ 0.1 dB per splice
• Link passes light tests at 1310 nm and 1550 nm
• All terminations neatly dressed, looped to standard bend radius, and clearly labeled
The schedule is flexible, but completion within two weeks of award is ideal. When you reply, please outline similar greenfield installs you have completed and confirm you can meet the testing specs above.
Your scope will include pulling and securing the cable, splicing, fitting all hardware, and running full certification tests. Please come equipped with your own fusion splicer, OTDR, power meter, and standard safety gear. Unless we agree otherwise, you will also supply the fiber, connectors, patch panels, trays, labels, and any mounting hardware.
Deliverables
• Fully installed single-mode fiber link, ready for service provider activation
• OTDR and optical power test reports (PDF)
• As-built diagram showing route, splice points, connector types, and labeling scheme
Acceptance Criteria
• Insertion loss ≤ 0.3 dB per connector and ≤ 0.1 dB per splice
• Link passes light tests at 1310 nm and 1550 nm
• All terminations neatly dressed, looped to standard bend radius, and clearly labeled
The schedule is flexible, but completion within two weeks of award is ideal. When you reply, please outline similar greenfield installs you have completed and confirm you can meet the testing specs above.