Technical Work Scope Library
Budget: $25 – $50 AUD
I have a detailed database of structural repair work scopes that have been built over a few years, which need to be all aligned with formatting and need to be rebranded and proof read and repaired where required. Currently, the database has 1000+ work scopes that vary from 5 pages to 50 pages. This could be a month or two project based on the amount and size of the documentation.