structure engineering

Job ID: 36357669

Budget: $30 – $250 USD

You are preparing the contractor shop drawings for the project drawings provided. The project consists of two phases:
1. Design of a sheet pile wall to support the existing CMU retaining wall that is failing. The sheet pile wall will be installed where clouded on the drawings, and will remain in place. After the sheet pile wall is installed, the soil will be excavated for installation of a new concrete retaining wall.
2.Design the formwork for the new cast-in-place reinforced concrete wall that the Engineer of Record has designed as shown on the drawings.