structural engineers

Job ID: 34240674

Budget: $250 – $750 AUD

Hi
I would like to replace timber middle wall structure with an I beam and RHS stud at the two ends.
What would it cost me for you to specify I beam, RHS stud and footing required.
Soil present silty sand , sand
Site classification Class A (in accordance with Section of AS 2870)