Wet Concrete report

Job ID: 36171075

Budget: £20 – £250 GBP

A report is to be drafted (in Word - English) in relation to testing wet concrete to give assurance to customers that the delivery quality of the ready mixed concrete is as required. The tests have been undertaken and results will be supplied along with photos for the report. 8000-9000 word count. To be completed by 26th March 2013.
Tests: 1) desity of wet concrete.
2) floatation test to show how much cement is present
3) slump test