PE Stamped CMU Wall Evaluation
Budget: $250 – $750 USD
I have a newly constructed CMU wall that now requires formal documentation and professional sign-off. Within one week I need:
• An accurate scaled as-built drawing of the wall developed from field sketch pdf
• A concise engineering review that confirms structural stability and verifies the wall matches the original design intent to IBC 2018 standard engineering practices.
• Final plans signed and sealed by an Illinois-licensed Professional Structural Engineer, ready for submission to the local building official
Please base your calculations, details, and notes on IBC 2018. I will supply existing sketches, dimensions for the eval. AutoCAD is fine; PDF plus the native file will be expected at hand-over.
Let me know your availability to start immediately and any additional data you might need so we stay on track for the one-week deadline.
• An accurate scaled as-built drawing of the wall developed from field sketch pdf
• A concise engineering review that confirms structural stability and verifies the wall matches the original design intent to IBC 2018 standard engineering practices.
• Final plans signed and sealed by an Illinois-licensed Professional Structural Engineer, ready for submission to the local building official
Please base your calculations, details, and notes on IBC 2018. I will supply existing sketches, dimensions for the eval. AutoCAD is fine; PDF plus the native file will be expected at hand-over.
Let me know your availability to start immediately and any additional data you might need so we stay on track for the one-week deadline.