Pedestrian Bridge Abutment Design and PE Stamp
Budget: $1,500 – $3,000 USD
Phase 1: Draft Top View with Proposed Dimensions and abutment details
*A Geotechnical Report shall be given to the Engineer Prior to the Plans being developed.
Phase 2: Project Draft Civil Plans with Load Calculations.
Phase 3: Plan Approval and P.E. Stamping.
Engineer must be a registed P.E. with a principal in structural or civil engineering.
Attached find the bridge to be installed.
Engineer can bid a fixed priced or a hourly price given that the hourly price is submitted with a estimated threshold for each phase of work.
*A Geotechnical Report shall be given to the Engineer Prior to the Plans being developed.
Phase 2: Project Draft Civil Plans with Load Calculations.
Phase 3: Plan Approval and P.E. Stamping.
Engineer must be a registed P.E. with a principal in structural or civil engineering.
Attached find the bridge to be installed.
Engineer can bid a fixed priced or a hourly price given that the hourly price is submitted with a estimated threshold for each phase of work.
Related categories:
Engineering
CAD/CAM
Building Architecture
Civil Engineering
Structural Engineering