17 X M ST, NW One Shear Wall DC PE license required

Job ID: 32860473

Budget: $250 – $750 USD

Runs Parrell to Column lines 4, between A and B 9'10" long 15'1" high, I have included the entire floor plan for the first floor and a zoomed clouding of the wall to have the stabilization designed.
Related categories: Structural Engineering