Heil plan engineering

Job ID: 32121082

Budget: $3,000 – $5,000 USD

What problems of load & shear are associated with this proposed build?
Last file is a 3d picture of 2nd floor stacked on first floor.
Previous opinion was the plan could hit 1500 lb. per sq. ft. soil assessment
Related categories: Structural Engineering