Finalize Missing Deck Plan Corrections
Budget: $250 – $750 USD
I already have the original engineered deck drawings as well as an updated set that fixed most issues. Two items still need attention—one small structural tweak and a lateral analysis
What I need from you is a concise set of correction notes, clearly marked on the existing drawings, rather than a fully redrafted plan. Please keep the file names and layer structure intact so my county reviewer can overlay them without extra steps.
Once finished, I’ll cross-check the notes against the permit comments, and if everything lines up we’re done—no additional revisions expected.
What I need from you is a concise set of correction notes, clearly marked on the existing drawings, rather than a fully redrafted plan. Please keep the file names and layer structure intact so my county reviewer can overlay them without extra steps.
Once finished, I’ll cross-check the notes against the permit comments, and if everything lines up we’re done—no additional revisions expected.