Fellowship hall
Budget: $250 – $750 USD
Remove load bearing walls to open up space
Install beams and columns to support the second floor 16” BCI joists.
Remove walls within red square box only with red X’s
Beams and columns will only need to support dead/live load of the 2nd floor. Not the roof and structure.
Install beams and columns to support the second floor 16” BCI joists.
Remove walls within red square box only with red X’s
Beams and columns will only need to support dead/live load of the 2nd floor. Not the roof and structure.