Engineer's report for non load bearing wall removal
Budget: $30 – $250 CAD
We have a very obviously non structural pony wall in our condo that we would like to remove. However, our strata management would like an engineer's report showing that the wall is ok to remove. It is basically a bar top pony wall.
Related categories:
Structural Engineering