Feasibility study of installing a wind mill and determining determine the levelised cost of energy (LCOE).

Job ID: 31629490

Budget: ₹1,500 – ₹12,500 INR

The wind speed of a particular site in South Australia is measured at a height of 50 m. The hourly wind data over a period of one year (or 8760 hours) is given in an Excel file (WindData_Hourly.xlsx). The objective of this assignment is to conduct a feasibility study of building a wind farm and estimate the levelised cost of energy (LCOE) in $/kWh.
Related categories: Statistics Renewable Energy Design