Calculating static of frame

Job ID: 35583411

Budget: €30 – €250 EUR

Hello,
we need for the frame you see a static.

What you have to know:
- we will store scaffolding material there (like steel boards as in the picture ending: 121046)

- we will store on the top of the frame (see orange) the steel boards max 108 pieces which has a total weight of approximatly 2052 kg (see picture with ending 121438 )

- under the orange line I have marked we will store scaffolding steel pipes with has a max 750 kg

- the steel we used is 40x30x2

My question is:
- Is this enough or should we use a steel which is thicker.
- You have to know that the material on this frame will be transported with the crane to the top of the bulding. So it must be a safe frame.

Thank you

If this need to be changed:
- What changes need to be done
- Can you provide new drawings?
Related categories: Engineering Statistics Urban Planning