Assembly of parts in Solid Works
Budget: $40 – $100 AUD
We need to assemble a few parts and require a simple animation of the Cup-Holders moving in the Linear-Circular-guide.
Need to make the following:
AT20 Belt - 150mm (Width) x 3000mm (Length)
Base Plate: 5mm (Thickness) 900mm (Width) x 1500mm (Length)
Assemble the following Parts:
Linear-circular-guide, Motor-Connector, Servo Motor, Pulley, AT20 Belt, Cup-Holder, Cup-Holder-Guide+Slide
Linear-Circular-Guide - We have 3 models available and needs to find which will be best suited for our assembly. (CX-200.Step, CX-255.Step, CX-300.Step). Holding-Cups (Holder-Base.step) will also be connected to the slides of the Linear-Circular-Guide.
Cup-Holder-Guide + Slide - We will provide you the files.
All other files attached.
There will be 6 Holding-Cups attached to the AT20 belt. We will need a animation to see the holding-Cups rotating correctly in the Linear-Circular-Guide.
Need to make the following:
AT20 Belt - 150mm (Width) x 3000mm (Length)
Base Plate: 5mm (Thickness) 900mm (Width) x 1500mm (Length)
Assemble the following Parts:
Linear-circular-guide, Motor-Connector, Servo Motor, Pulley, AT20 Belt, Cup-Holder, Cup-Holder-Guide+Slide
Linear-Circular-Guide - We have 3 models available and needs to find which will be best suited for our assembly. (CX-200.Step, CX-255.Step, CX-300.Step). Holding-Cups (Holder-Base.step) will also be connected to the slides of the Linear-Circular-Guide.
Cup-Holder-Guide + Slide - We will provide you the files.
All other files attached.
There will be 6 Holding-Cups attached to the AT20 belt. We will need a animation to see the holding-Cups rotating correctly in the Linear-Circular-Guide.