Power Systems Protection PSCAD Modeling
Budget: $10 – $30 USD
Send something like this:
> Hi,
>
> I need someone to complete **all PSCAD-related work** for a Protection Systems project.
>
> Scope of work:
>
> * Build the complete PSCAD model of the power system shown in the project diagram.
> * Model the source, transformer (34.5/12.47 kV), transmission line, buses, feeders, loads, CTs, overcurrent relays, and transformer differential relay.
> * Implement all relay settings that will be provided (pickup currents, TDS/TMS, CT ratios, differential settings, etc.).
> * Simulate the required fault cases:
>
> * Three-phase (3Φ) faults
> * Line-to-line (LL) faults
> * Single line-to-ground (SLG) faults
> * Internal transformer faults
> * Apply faults at different locations (feeder, Bus C, Bus B, near transformer, etc.).
> * Verify correct operation of primary and backup protection.
> * Record relay operating times and verify the 18-cycle coordination requirement.
> * Provide PSCAD screenshots, waveforms, relay operation results, and any output data needed for the report.
> * Deliver the PSCAD project file and explain how the model is configured.
>
> Project requirements are attached. I only need the PSCAD modeling, simulations, relay implementation, and result extraction.
>
> Please let me know:
>
> * Your experience with PSCAD and power system protection.
> * Estimated completion time.
> * Price.
> Hi,
>
> I need someone to complete **all PSCAD-related work** for a Protection Systems project.
>
> Scope of work:
>
> * Build the complete PSCAD model of the power system shown in the project diagram.
> * Model the source, transformer (34.5/12.47 kV), transmission line, buses, feeders, loads, CTs, overcurrent relays, and transformer differential relay.
> * Implement all relay settings that will be provided (pickup currents, TDS/TMS, CT ratios, differential settings, etc.).
> * Simulate the required fault cases:
>
> * Three-phase (3Φ) faults
> * Line-to-line (LL) faults
> * Single line-to-ground (SLG) faults
> * Internal transformer faults
> * Apply faults at different locations (feeder, Bus C, Bus B, near transformer, etc.).
> * Verify correct operation of primary and backup protection.
> * Record relay operating times and verify the 18-cycle coordination requirement.
> * Provide PSCAD screenshots, waveforms, relay operation results, and any output data needed for the report.
> * Deliver the PSCAD project file and explain how the model is configured.
>
> Project requirements are attached. I only need the PSCAD modeling, simulations, relay implementation, and result extraction.
>
> Please let me know:
>
> * Your experience with PSCAD and power system protection.
> * Estimated completion time.
> * Price.