OLGA Oil Field - LP Gas Network Integration - Flow Assurance Study

Job ID: 40174934

Budget: $30 – $250 USD

I have a field of multiple oil platforms.

Project is to connect the LP network together.

Want to simulate if this is feasible, considering existing infrastructure and slugging.


I want your help in building an OLGA simulation for flow assurance purposes, as my knowledge in OLGA is quite limited.