Balancing and Optimization of production line based on Anylogic -- 2

Job ID: 36073475

Budget: $30 – $250 USD

need someone to create a production line simulation model on Anylogic software that will be needed to optimize and balance a production line of a manufacturing and repair workshop. The model should be not very complicated but simple.

ps: this project requires strong knowledge and experience in the multimethod simulation modeling tool Anylogic