Excel SharePoint Script

Job ID: 39173002

Budget: $30 – $250 USD

For a shared Excel file on Sharepoint, need two scripts (or a way to do the following):

1. On opening the Excel file, hide any row in which all dates in the row are more than 7 days from the current date.

2. On opening the file, any cell that has a date with text in bold and the date is today or before, will have the cell background turn white and the cell text turn red.
Related categories: Visual Basic .NET Excel C# Programming Sharepoint