Urgent SAP PS Configuration Fix - Project Progress & Result Analysis
Budget: $30 – $40 USD
My client's SAP S/4HANA practice system is refusing to save key settings in the PS module, stopping us from getting reliable Project Progress and Revenue Analysis. I need someone who already knows the quirks of SAP PS inside out and can step in immediately to bring the configuration back to life and complete the missing setups.
Primary issues
• The current configuration will not save, so every change rolls back.
• Because of that, Progress reporting for Project Progress Analysis is incomplete and not showing BCWS, BCWP in CNE5 properly along with CVI.
• Profitability analysis under Project Revenue Analysis has never been fully configured.
What I expect from you
• Diagnose and permanently resolve the “configuration not saving” fault.
• Activate and validate all Progress reporting functionality so that project managers see real-time percentages, earned value, and variance in the standard PS analytics.
• Configure Profitability analysis so revenue, cost, and margin are correctly reflected against WBS elements and rolled up for each project.
• Work directly in my S/4HANA practice system, document every transport or SPRO path you touch, and leave my client with clear steps to repeat the setup in production.
Timing
This has to be wrapped up—tested and working—no later than the evening of 21 Sep 2025 (my local time). client will be online to provide system access and quick decisions throughout.
If you have recent, hands-on SAP PS experience and the next few days free, let’s get this fixed.
Primary issues
• The current configuration will not save, so every change rolls back.
• Because of that, Progress reporting for Project Progress Analysis is incomplete and not showing BCWS, BCWP in CNE5 properly along with CVI.
• Profitability analysis under Project Revenue Analysis has never been fully configured.
What I expect from you
• Diagnose and permanently resolve the “configuration not saving” fault.
• Activate and validate all Progress reporting functionality so that project managers see real-time percentages, earned value, and variance in the standard PS analytics.
• Configure Profitability analysis so revenue, cost, and margin are correctly reflected against WBS elements and rolled up for each project.
• Work directly in my S/4HANA practice system, document every transport or SPRO path you touch, and leave my client with clear steps to repeat the setup in production.
Timing
This has to be wrapped up—tested and working—no later than the evening of 21 Sep 2025 (my local time). client will be online to provide system access and quick decisions throughout.
If you have recent, hands-on SAP PS experience and the next few days free, let’s get this fixed.