Mobile Bitcoin Miner Caravan Design
Budget: $250 – $750 USD
Freelance Job Posting: Shop Drawing for Portable Bitcoin Mining Caravan (24 Hydro Miners – Closed-Loop Cooling System)
We are hiring a skilled architectural / MEP designer (AutoCAD, Revit, SolidWorks, etc.) to develop a comprehensive shop drawing for a mobile Bitcoin mining setup housed inside a portable caravan or trailer. The system will house 24 hydro-cooled Antminer units, with an integrated closed-loop cooling system, air-conditioned service area, and compact toilet, all properly reinforced for safe transport.
⸻
Project Scope:
• Structure: Mobile caravan or trailer (custom-fabricated or converted container)
• Miners: 24 x Antminer Hydro-cooled units (e.g., S19 257T), installed in enclosed cabinets
• Cooling System:
• Closed-loop cooling tower system, mounted externally but partially concealed (e.g., louvers or panel cladding)
• 1000-liter water storage tank
• Pump 1: Recirculates water to/from miners
• Pump 2: Circulates water within the cooling tower circuit
• Interior Requirements:
• Dedicated enclosed miner room
• AC-cooled technician/service area
• Compact toilet with washbasin, water tank, and drainage
⸻
Mobility & Structural Safety:
• All components must be securely fixed for mobile transport
• Cabinets, tanks, pumps, and cooling components must be braced against vibration
• Weight distribution and access for maintenance must be considered
• Electrical and water connections should use fast disconnect fittings
⸻
Required Deliverables:
1. Detailed 2D Shop Drawings:
• Floorplan with miner, cooling, AC, and toilet zones
• Sectional/elevation views
• Cooling system layout: piping, 1000L tank, dual pumps
• Electrical load distribution (panels, breakers, cable paths)
• AC and ventilation flow routing
• Toilet plumbing (fresh + waste water)
2. Structural Integration:
• Anchoring details for pumps, cabinets, tank, and equipment
• Louver design or visual shielding for cooling tower
• Insulation or noise-reduction recommendations (if any)
3. Optional but Preferred:
• 3D Render or SketchUp visualization
• Bill of Quantities (BoQ) for MEP equipment
⸻
Key Design Considerations:
• Cooling efficiency & water flow integrity
• Space optimization for all internal functions
• Thermal isolation of miner room from AC zone
• Easy servicing and access to pumps, tank, and tower
• Road-safe and transport-ready configuration
⸻
To Apply:
• Share past work samples (preferably mining farms, MEP layouts, or mobile units)
• Provide delivery timeline and number of revisions included
• Specify software used
• Quote your price (fixed or hourly)
We are hiring a skilled architectural / MEP designer (AutoCAD, Revit, SolidWorks, etc.) to develop a comprehensive shop drawing for a mobile Bitcoin mining setup housed inside a portable caravan or trailer. The system will house 24 hydro-cooled Antminer units, with an integrated closed-loop cooling system, air-conditioned service area, and compact toilet, all properly reinforced for safe transport.
⸻
Project Scope:
• Structure: Mobile caravan or trailer (custom-fabricated or converted container)
• Miners: 24 x Antminer Hydro-cooled units (e.g., S19 257T), installed in enclosed cabinets
• Cooling System:
• Closed-loop cooling tower system, mounted externally but partially concealed (e.g., louvers or panel cladding)
• 1000-liter water storage tank
• Pump 1: Recirculates water to/from miners
• Pump 2: Circulates water within the cooling tower circuit
• Interior Requirements:
• Dedicated enclosed miner room
• AC-cooled technician/service area
• Compact toilet with washbasin, water tank, and drainage
⸻
Mobility & Structural Safety:
• All components must be securely fixed for mobile transport
• Cabinets, tanks, pumps, and cooling components must be braced against vibration
• Weight distribution and access for maintenance must be considered
• Electrical and water connections should use fast disconnect fittings
⸻
Required Deliverables:
1. Detailed 2D Shop Drawings:
• Floorplan with miner, cooling, AC, and toilet zones
• Sectional/elevation views
• Cooling system layout: piping, 1000L tank, dual pumps
• Electrical load distribution (panels, breakers, cable paths)
• AC and ventilation flow routing
• Toilet plumbing (fresh + waste water)
2. Structural Integration:
• Anchoring details for pumps, cabinets, tank, and equipment
• Louver design or visual shielding for cooling tower
• Insulation or noise-reduction recommendations (if any)
3. Optional but Preferred:
• 3D Render or SketchUp visualization
• Bill of Quantities (BoQ) for MEP equipment
⸻
Key Design Considerations:
• Cooling efficiency & water flow integrity
• Space optimization for all internal functions
• Thermal isolation of miner room from AC zone
• Easy servicing and access to pumps, tank, and tower
• Road-safe and transport-ready configuration
⸻
To Apply:
• Share past work samples (preferably mining farms, MEP layouts, or mobile units)
• Provide delivery timeline and number of revisions included
• Specify software used
• Quote your price (fixed or hourly)