Dubai Hotel ELV Systems Design
Budget: $250 – $750 USD
I’m finalising the concept for a new four-star hotel in Dubai and need a complete ELV design package that is ready for authority submission, tender and construction. The scope covers every low-current system the property will rely on: CCTV, access control, public address, structured cabling, LAN/Wi-Fi, IPTV, lighting control, IP PBX/phones, wireless intercom, guard-tour, vehicle and pedestrian barriers, UPS back-up, and all audio-visual LED display points.
CCTV coverage must extend to the reception and lobby, all corridors and other common areas, parking entrances and exterior approaches, as well as the guest rooms themselves. All other subsystems have to share the same structured cabling backbone and integrate seamlessly with the hotel PMS, BMS, fire-alarm interface and any future guest-experience apps.
Deliverables
• Single-line and schematic drawings (AutoCAD/Revit format)
• Detailed equipment schedules, data sheets and BoQ with manufacturer part numbers
• Network architecture and VLAN segmentation diagram for LAN/Wi-Fi and IPTV distribution
• Rack layouts, cable routings and load calculations for UPS and critical nodes
• Integration diagrams showing links to PMS, BMS and fire-alarm panels
• Installation, testing and commissioning method statements
Acceptance criteria
The design will be considered complete when the above items have been supplied, coordinated clashes resolved, and all documents meet Dubai Civil Defence and local authority ELV requirements ready for stamping.
CCTV coverage must extend to the reception and lobby, all corridors and other common areas, parking entrances and exterior approaches, as well as the guest rooms themselves. All other subsystems have to share the same structured cabling backbone and integrate seamlessly with the hotel PMS, BMS, fire-alarm interface and any future guest-experience apps.
Deliverables
• Single-line and schematic drawings (AutoCAD/Revit format)
• Detailed equipment schedules, data sheets and BoQ with manufacturer part numbers
• Network architecture and VLAN segmentation diagram for LAN/Wi-Fi and IPTV distribution
• Rack layouts, cable routings and load calculations for UPS and critical nodes
• Integration diagrams showing links to PMS, BMS and fire-alarm panels
• Installation, testing and commissioning method statements
Acceptance criteria
The design will be considered complete when the above items have been supplied, coordinated clashes resolved, and all documents meet Dubai Civil Defence and local authority ELV requirements ready for stamping.