Detail Design & Installation Drawings – Fire Suppression System for Chemical Warehouse (HCIS Stage 2)

Job ID: 40146792

Budget: $1,500 – $3,000 USD

I am wrapping up HCIS Stage 2 for a new chemical storage warehouse and now need complete detail design and installation drawings for the fire-suppression system. Everything must comply fully with NFPA guidelines; this is the single non-negotiable requirement.

The exact suppression technology is still open. Whether a conventional wet sprinkler layout, a foam-water combination, clean-agent gas, or another approach ends up being the safest choice, it has to be selected strictly “as per NFPA requirements” after you review the chemical inventory and hazard classification for the building. In short, I’m looking for an engineer who can interpret the NFPA chapters that govern chemical warehouses, translate them into a compliant system concept, and then develop all the drawings and documents needed for installation approval.

Deliverables I need to sign off the job:
• Code-compliant design narrative outlining the chosen NFPA sections and hazard calculations
• Full set of coordinated drawings (plans, sections, riser diagrams, details) ready for construction
• Hydraulic or flow calculations stamped or otherwise verifiable
• Equipment schedules, nozzle/valve layouts, and material take-off list
• Interface notes for the existing fire-alarm panel and any detection or foam-concentrate skids
• Compliance matrix showing item-by-item alignment with the relevant NFPA clauses for chemical warehouses

Provide everything in PDF plus editable CAD (DWG) or Revit format so the installer can move straight into procurement and fabrication. If you have recent experience designing NFPA-compliant systems for hazardous or chemical storage facilities, that will help us move quickly.