Commercial Plumbing & Electrical Drawings
Budget: $750 – $1,500 USD
I need a complete set of mechanical drawings that clearly show both the plumbing and electrical systems for a commercial space I’m renovating. Time is tight—please be ready to begin immediately and deliver the first draft right away, with revisions wrapped up as fast as practical.
Scope
The job covers every pipe, fitting, wire run, panel, and fixture so that my contractor can move straight from the plans to installation without guesswork. I’ll supply floor plans in PDF and any field notes you need; you turn them into coordinated, code-compliant drawings in AutoCAD, Revit, or an equivalent CAD platform.
Deliverables
• Coordinated plumbing layout with pipe sizing, slopes, vents, and fixture tags
• Electrical layout showing circuits, conduit sizing, panel schedules, and load calculations
• Combined drawing set in both native CAD (DWG or RVT) and print-ready PDF
• One round of revisions included to resolve clashes or clarify details
Acceptance Criteria
Drawings must be scaled, layer-organized, and ready for permit submission. All symbols and legends should follow standard North American practice so inspectors can sign off without back-and-forth.
Let me know how quickly you can start and confirm the software you’ll be using so we can lock this in today.
Scope
The job covers every pipe, fitting, wire run, panel, and fixture so that my contractor can move straight from the plans to installation without guesswork. I’ll supply floor plans in PDF and any field notes you need; you turn them into coordinated, code-compliant drawings in AutoCAD, Revit, or an equivalent CAD platform.
Deliverables
• Coordinated plumbing layout with pipe sizing, slopes, vents, and fixture tags
• Electrical layout showing circuits, conduit sizing, panel schedules, and load calculations
• Combined drawing set in both native CAD (DWG or RVT) and print-ready PDF
• One round of revisions included to resolve clashes or clarify details
Acceptance Criteria
Drawings must be scaled, layer-organized, and ready for permit submission. All symbols and legends should follow standard North American practice so inspectors can sign off without back-and-forth.
Let me know how quickly you can start and confirm the software you’ll be using so we can lock this in today.
Related categories:
CAD/CAM
Building Architecture
Mechanical Engineering
Electrical Engineering
AutoCAD
Revit
3D CAD
3D Drafting