Transmission and Distribution Power System Performance using ERacs SoftWare

Job ID: 33179719

Budget: £20 – £250 GBP

ERACS Software

The performance of a 220 kV transmission line (TL) is to be studied with regard to power
flow analysis. The line may be assumed to be fed from an ‘infinite’ generator (the Grid) and
terminated with a lumped load with fixed real and reactive power.