Transmission and Distribution Power System Performance using ERacs SoftWare
Budget: £20 – £250 GBP
ERACS Software
The performance of a 220 kV transmission line (TL) is to be studied with regard to power
flow analysis. The line may be assumed to be fed from an ‘infinite’ generator (the Grid) and
terminated with a lumped load with fixed real and reactive power.
The performance of a 220 kV transmission line (TL) is to be studied with regard to power
flow analysis. The line may be assumed to be fed from an ‘infinite’ generator (the Grid) and
terminated with a lumped load with fixed real and reactive power.