Perchloroethylene Manufacturer Stop Work report
Budget: $30 – $250 USD
As EHS manager of perchloroethylene manufacturer. An exposure incident occurred which led to Ministry of Manpower to issue a Stop Work Order to the facility.
Personal exposure monitoring carried out 8 months before the incident showed the latest average 8-hour time- weighted exposure level was 40% of the Permissible Exposure Level (PEL).
Expectations:
Draft a report to convince MOM and get Stop Work order lifted. The document must include Cover Page, Executive Summary, Content Page, 3500 words main report, references, annexes and attachments.
Personal exposure monitoring carried out 8 months before the incident showed the latest average 8-hour time- weighted exposure level was 40% of the Permissible Exposure Level (PEL).
Expectations:
Draft a report to convince MOM and get Stop Work order lifted. The document must include Cover Page, Executive Summary, Content Page, 3500 words main report, references, annexes and attachments.