Advance Control Engineering 4

Job ID: 33179666

Budget: £20 – £250 GBP

ERACS SoftWare

The performance of a 220 kV transmission line (TL) is to be studied with regard to power
flow analysis. The line may be assumed to be fed from an ‘infinite’ generator (the Grid) and
terminated with a lumped load with fixed real and reactive power. The following system data