detailed 2 d and 3d views of primary school
Budget: ₹1,500 – ₹12,500 INR
hi,
scope of works , prepare 2d for the already prepared plan and elevation ,once 2d finalized finalize 3d views min 5 views for the buildings.
building type - G+2 structure
total build up area- 900 m2
type simple typical floor plan
design - tradition type for monsoon type building
duration- 6-10 days
detailed scope attached
scope of works , prepare 2d for the already prepared plan and elevation ,once 2d finalized finalize 3d views min 5 views for the buildings.
building type - G+2 structure
total build up area- 900 m2
type simple typical floor plan
design - tradition type for monsoon type building
duration- 6-10 days
detailed scope attached