Cabin Bath - Phase II

Job ID: 35853751

Budget: $25 – $50 USD

I am remodeling a 100-year old cabin and need assistance in designing the main bath for the house. I will be converting an existing space into the bath. Currently, it is unfinished and has no plumbing or electrical. So there is a lot of room for creativity.

The space is 9'4" (2.8m) wide by 8' (2.4m). Three walls are existing and a new wall will be built with a door. There is a skylight in the space. The ceiling is sloped with the right side (as viewed from the door) higher than the left. Height dimensions will be provided.

The overall architecture of the remodel will be rustic-modern. I want to maximize the use of natural materials (wood, stone) for a warm, comfortable feel. At 81 sq. ft. (7.5 sq. m), this bath should feel spacious and spa-like.

The design should include lighting. There is an existing skylight, but additional natural light is desired. The cabin sits on a hillside and is somewhat secluded. I would like to explore the idea of several narrow, vertical windows that extend from floor to ceiling. The idea would be to have windows that would provide reasonable privacy while bringing the natural light and forest into the bath.

At a minimum, the bath must include: shower, toilet, basin, and storage. I like the idea of a wall-hung toilet for both space and style. There must be sufficient storage for towels and toiletries.

A washer and dryer must also be included in the design. For planning purposes, there will be a separate washer and dryer. There are two design options I would like to explore. The first is to place these under a multi-use countertop, perhaps with cabinets above. The other option is to stack them so that they may be accessed from outside of the bath.

Immediately outside of the bath is the "mud room" or entrance to the cabin. The room outside the bath will be used for jackets and dirty boots. As you enter the main door, the bath will be located straight ahead. I am considering the use of an architectural "barn door" for the bath.

The most important product in this phase will be to locate the structural and construction elements: location of plumbing, electrical and framing of windows. Final selection of materials and specifying products can come in subsequent phases.

There is not budget constraint, but all materials must be standard and reasonable. I am not going to consider any custom-made products or rare materials.

This is another property that I really like. I do not want to copy it. It is much larger than my property, but I like the feel and style of this property: https://www.vrbo.com/1379249

I am open to any and all ideas. I do not want to constrain your creativity. I have attached some pictures for consideration - Lisset you may see some familiar pictures :-)