Waste management project
Budget: $3,000 – $5,000 USD
Building a waste detection model connected to ip camera in a real-time analysis and extracting the trash location (latitude and longitude), build a web application interface in localhost and build a database containing waste object with its real location (latitude and longitude)
Data is almost ready (Labeled)
Data is almost ready (Labeled)