70 $ SYSTEM IDEA – DOORS PRODUCTION & PROJECT CONTROL DASHBOARD

Job ID: 40342816

Budget: $10 – $30 USD

The goal of this system is to provide real-time visibility and control over every customer project, from sales confirmation to final delivery and warranty.
This is not a reporting tool. It is an operational decision system that allows management to immediately identify:
– where each project is in the pipeline
– which department is responsible
– which projects have delays or risks
– what action must be taken
CORE PRINCIPLE
Each project flows through a fixed sequence of departments (stages).
A stage is only activated when the project officially reaches that department.
Before that, the stage remains blank (no status, no color).
Each stage has its own:
– Trigger (handover date)
– Planned date
– Actual completion
– Status (auto-calculated)
– Delay Reason (comment field)
– Action / Comment (free text for management)
STATUS LOGIC (STANDARDIZED ACROSS ALL STAGES)
The system automatically assigns a status based on data input:
Blank → Project has not reached this department
Green → Completed or running on time
Orange → Issue exists but a plan is in place (within deadline)
Red → No plan OR deadline missed
Status Decision Logic
– If Trigger Date is empty → BLANK
– If Completed = YES → GREEN
– If Planned Date exists and Today ≤ Planned → ORANGE
– If Planned Date is missing → RED
– If Today > Planned Date and not completed → RED

PROJECT FLOW (DEPARTMENTS ORDER)
1 Sales Confirm
2 Accounting 50% (Deposit Gate)
3 Cutting List
4 Stock Check
5 Purchase (only if materials missing)
6 Stock Received
7 Production
8 Factory QC
9 Delivery
10 Accounting 40%
11 Installation
12 Sales QC
13 Accounting Final 10%
14 Warranty / Feedback