Report on a system - risk management

Job ID: 30759774

Budget: $10 – $30 USD

I need a report on a specific system in a project in the UAE (Example: Railway of the Metro in Dubai). The report should consist of the following:
1- Name of project and the stakeholders
2- Cost and timeframe
3- Breakdown structure (WBS)/Drawing of the system's function (Drawing of how it works) NO NEED FOR WORDS JUST DRAWING
4- Specify the type of risk management process that should be used
5- List 5 risks anticipated in the system and write the risk statement of each risk

Must let me know what project's system you will choose.

Need it in 36 hours