Technical & Economic Study for Phosphate Processing & Washing Plant (10,000 TPD)

Job ID: 40193921

Budget: $250 – $750 USD

We are seeking an experienced industrial consulting company to prepare a technical and economic study for a phosphate processing and washing plant with a target capacity of 10,000 tons per day.

This scope focuses only on factory setup and production infrastructure.
Market analysis and selling prices are not required, as these are already defined.

Scope of work:

Detailed list of required machinery and equipment, including:

Crushers / mills

Washing units

Classification and separation systems

Dewatering units

Conveyors and auxiliary systems

Production capacity analysis for each processing stage to achieve 10,000 TPD

Conceptual plant layout, including:

Equipment dimensions

Space requirements

Process flow diagram

Estimated CAPEX for plant setup (equipment, installation, and infrastructure)

Operational requirements:

Power consumption

Water consumption

Manpower (high-level)

Estimated production cost per ton, based on plant operation only

Deliverables:

Technical & economic study report (PDF)

Real equipment references with photos and manufacturer information

Clear tables, diagrams, and technical explanations

Preferred qualifications:

Industrial consulting or engineering company (not individuals)

Proven experience in mineral processing, mining, or washing plants

Preference for consultants with direct access to Chinese machinery manufacturers

This study will be used as a technical reference for investment and implementation planning.