MS Word Document Enhancements
Budget: $10 – $30 USD
I need assistance with updating an MS Word document. The updates primarily consist of text additions in the form of bullet points or lists. These additions should be simply typed into the appropriate rows, without needing to adhere to a specific format or style.
Ideal skills for this project include:
- Proficiency in MS Word
- Attention to detail
- Ability to follow instructions accurately
CHECK THE ATTACHED DOCUMENT
GO TO DESCRIPTION OF WORK SEGMENT
5. Removal of current Kurasini Oil Jetty
Cost and Time
6. Location of new oil jetty
Site survey
7. Construction of new oil jetty
Updated capacity if any as confirmed by TPA
Cost and Time
8. Simulation Animation for presentation
9. Rail consultancy
10. Railhead at the port incorporated into survey and design
11. Rail route survey and design to Container Satellite City in Vingunguti area
Cost and Time for above elements too
12. Simulation Animation for the Project Animation 90 minutes long
Show relocation of oil jetty
Show construction of new oil jetty
Show operations of new oil jetty
Show construction of Berths 12 to 15
Show construction of railhead at Berths 12 to 15
Show operations at berths 12 to 15
Show port rail operations of loading containers on to waggons going to Container Satellite City
Show operations at Container Satellitie City in terms of loading and storing the containers at the site with use of machines
Ideal skills for this project include:
- Proficiency in MS Word
- Attention to detail
- Ability to follow instructions accurately
CHECK THE ATTACHED DOCUMENT
GO TO DESCRIPTION OF WORK SEGMENT
5. Removal of current Kurasini Oil Jetty
Cost and Time
6. Location of new oil jetty
Site survey
7. Construction of new oil jetty
Updated capacity if any as confirmed by TPA
Cost and Time
8. Simulation Animation for presentation
9. Rail consultancy
10. Railhead at the port incorporated into survey and design
11. Rail route survey and design to Container Satellite City in Vingunguti area
Cost and Time for above elements too
12. Simulation Animation for the Project Animation 90 minutes long
Show relocation of oil jetty
Show construction of new oil jetty
Show operations of new oil jetty
Show construction of Berths 12 to 15
Show construction of railhead at Berths 12 to 15
Show operations at berths 12 to 15
Show port rail operations of loading containers on to waggons going to Container Satellite City
Show operations at Container Satellitie City in terms of loading and storing the containers at the site with use of machines