Webflow to Kualo Migration -- 2
Budget: £10 – £20 GBP
I need my existing Webflow-hosted site transferred in full to my Kualo hosting account. The move itself is straightforward, yet I anticipate a few minor updates: chiefly, ironing out anything that breaks once Webflow’s built-in CMS is no longer in play. It cannot be exported because Webflow is asking for an upgrade before the export which I don't want to pay them for.
Website is simple: https://www.kaboni.org
What that means in practice: every page, asset, form and interaction must load and behave exactly as it does now, but on Kualo’s platform. If any collections or dynamic areas lose their functionality after export, I want equivalent static pages or lightweight alternatives put in place so visitors never notice the difference.
Deliverables
• All site files migrated and working on Kualo
• URLs preserved (or properly redirected) to avoid SEO drops
• Issues caused by the removal of Webflow CMS fixed or replaced with static/dynamic code that runs on standard LAMP hosting
• Final walkthrough so I can verify everything before pointing DNS
Please handle the whole process—from exporting in Webflow, setting up the new environment at Kualo, to the post-migration sanity checks.
Please bid with your final price, not to start negotiations.
Website is simple: https://www.kaboni.org
What that means in practice: every page, asset, form and interaction must load and behave exactly as it does now, but on Kualo’s platform. If any collections or dynamic areas lose their functionality after export, I want equivalent static pages or lightweight alternatives put in place so visitors never notice the difference.
Deliverables
• All site files migrated and working on Kualo
• URLs preserved (or properly redirected) to avoid SEO drops
• Issues caused by the removal of Webflow CMS fixed or replaced with static/dynamic code that runs on standard LAMP hosting
• Final walkthrough so I can verify everything before pointing DNS
Please handle the whole process—from exporting in Webflow, setting up the new environment at Kualo, to the post-migration sanity checks.
Please bid with your final price, not to start negotiations.