Streaming Platform – Technical Validation & Final Adjustments -Bids without confirming scope review will be discarded -- 2

Job ID: 39843542

Budget: $250 – $750 USD

Project – Live Streaming Platform (Laravel + React)

Important (non-negotiable)

The platform is already live, with streaming, payments (Stripe + Mercado Pago), tokens, subscriptions, moderation, notifications, and admin panel.
The site currently has no user-generated content, but the technical structure is active.
This is not a new build and not a full redesign.

Objective

Fix identified issues.

Validate pending flows (payments, moderation, admin, tokens, PWA, notifications).

Adjust financial reports.

Apply targeted visual refinements (no redesign).

Deliver a 100% validated platform, with all functionalities, rules, site integration, control panel, PWA, and payment methods fully working in production according to the Project Overview document.

Provide videos, logs, and updated manual as proof of delivery.

Acceptance is only possible when 100% of the scope is validated in production, without exceptions.

Deliverables

Fixes proven by video + logs, recorded directly in production.

Updated code manual.

PWA with Lighthouse ≥ 90.

Admin panel completed (splits, reports, real-time alerts).

Production keys configured (Stripe, Mercado Pago, Firebase, AWS).

Daily commits on the client’s repository.

At the conclusion of each functionality or rule, the developer must record and deliver a video demonstrating its behavior and compliance. Each item will only be considered delivered after validation in production.

Payment flows must be tested with real low-value transactions (Stripe + Mercado Pago) to validate split, fallback, and reconciliation.

Work Environment

Work performed exclusively on the client’s GitHub repository (daily commits, mandatory PRs).

Development on the client’s AWS/EC2 server, with monitored sessions.

Changes only via Pull Requests, approved with CI/CD active.

Automatic deploy to staging after each merge into main.

Productivity tracked in real time (commits, logs, PRs, videos, CI/CD status).

Before development starts, the entire scope must be organized into a timeline using a project management tool (e.g., Trello or equivalent). The timeline must include all functionalities and tasks. Development will only begin after client approval of this timeline.

Continuous work until 100% scope validation in production, with no abandonment or partial delivery.

Mandatory Checklist

Confirm: “I watched the videos and read the 3 documents.”

Provide a fixed price + timeline, based on the current project stage.

Confirm agreement with:

Client’s repository + daily commits.

PRs with video and logs.

Client’s AWS/EC2 server.

Deploy to staging with CI/CD.

Videos at the end of each delivered functionality for validation.

Be available for a technical interview.

Proposals without confirmation of material review + fixed price/timeline will be rejected.

Mandatory Materials (before submitting a proposal)

Video presentation:
https://docs.google.com/document/d/1u1mzghyYwkItrBik1Kyn4CJSXxopBjad/edit?usp=sharing&ouid=118106770299048243510&rtpof=true&sd=true

Test report (50% validated):
https://docs.google.com/document/d/1eOpull0tYv4r4wmGtLnxWCGHbo1Pagjw/edit?usp=sharing&ouid=118106770299048243510&rtpof=true&sd=true

Project overview (final scope):
https://docs.google.com/document/d/1TRfoR0TTo_rBXh7k1pIIbT7U_mPBayet/edit?usp=sharing&ouid=118106770299048243510&rtpof=true&sd=true