Marrakesh GMMX Exterior Photo Set
Budget: $250 – $750 USD
I need a complete, high-resolution exterior photo survey of Marrakesh Menara Airport (ICAO GMMX). The images will drive photogrammetric 3D modeling and texturing for an X-Plane 12 flight simulator scenery product build, so coverage and clarity are critical.
Scope of coverage
• Terminals and boarding gate façades (airside and landside)
• Hangars and all maintenance buildings, including roof structures and service doors
• General landside elevations of every publicly visible airport building
No interior shots are required; everything can be captured from ramp, perimeter road, or other legal exterior viewpoints.
Deliverables
1. A clearly organised folder structure (Terminals, Hangars, Landside, etc.) containing colour-corrected JPEGs or RAW files at a minimum of 24 MP.
2. Consistent daylight lighting, minimal lens distortion, and unobstructed views wherever operationally possible.
3. Basic metadata or a simple text file noting shooting locations and headings so I can align the material during modelling.
If you already have airside access, please mention it when you submit—otherwise, landside vantage points that still provide clean lines of sight are acceptable. Turn-around within two weeks of kickoff would be ideal.
Scope of coverage
• Terminals and boarding gate façades (airside and landside)
• Hangars and all maintenance buildings, including roof structures and service doors
• General landside elevations of every publicly visible airport building
No interior shots are required; everything can be captured from ramp, perimeter road, or other legal exterior viewpoints.
Deliverables
1. A clearly organised folder structure (Terminals, Hangars, Landside, etc.) containing colour-corrected JPEGs or RAW files at a minimum of 24 MP.
2. Consistent daylight lighting, minimal lens distortion, and unobstructed views wherever operationally possible.
3. Basic metadata or a simple text file noting shooting locations and headings so I can align the material during modelling.
If you already have airside access, please mention it when you submit—otherwise, landside vantage points that still provide clean lines of sight are acceptable. Turn-around within two weeks of kickoff would be ideal.