Primavera installation

Job ID: 33729401

Budget: $10 – $100 USD

Install Primavera P6 stand alone version on my PC (running Windows 10) by taking remote control of the PC. I have the disks. Apparently Oracle XE needs to be installed.
Related categories: Oracle Primavera