Oracle P6 EPPM Implementation Arabic Consultant -- 2
Budget: $250 – $750 USD
I am rolling out Oracle Primavera P6 EPPM for an engineering-construction client and need a seasoned consultant who can take the implementation from discovery through go-live entirely in Arabic.
First, you will lead on-site discovery sessions with project managers, planners, and cost-control engineers, capturing their current workflows and KPIs, then translate them into a fit-for-purpose P6 design.
Next comes the build: install and configure the full P6 EPPM stack, establish EPS/WBS structures, global calendars, resource pools, security profiles, and cost accounts, and verify that everything performs smoothly on the client’s infrastructure.
Comprehensive bilingual (Arabic/English) documentation is essential. I expect a clear admin guide, user manual, configuration records, and troubleshooting references that let the in-house IT team maintain the system long-term.
Training is critical. My staff already understand the basics; they need advanced techniques and customization with an emphasis on cost control—earned-value management, cash-flow curves, baselines, and tailored dashboards. Plan for instructor-led classes, live demos, and recorded sessions so they can revisit the material later.
Deliverables:
• Fully functional Oracle P6 EPPM instance that passes user-acceptance testing
• Complete documentation pack (admin guide, user guide, training deck) in Arabic and English
• Two days of advanced, cost-control–focused training plus follow-up Q&A support
If you have proven P6 EPPM implementation experience in the engineering or construction sectors, can communicate fluently in Arabic, and can begin within the next two weeks, I’d like to review your approach and sample documentation. Let’s make this rollout a success.
First, you will lead on-site discovery sessions with project managers, planners, and cost-control engineers, capturing their current workflows and KPIs, then translate them into a fit-for-purpose P6 design.
Next comes the build: install and configure the full P6 EPPM stack, establish EPS/WBS structures, global calendars, resource pools, security profiles, and cost accounts, and verify that everything performs smoothly on the client’s infrastructure.
Comprehensive bilingual (Arabic/English) documentation is essential. I expect a clear admin guide, user manual, configuration records, and troubleshooting references that let the in-house IT team maintain the system long-term.
Training is critical. My staff already understand the basics; they need advanced techniques and customization with an emphasis on cost control—earned-value management, cash-flow curves, baselines, and tailored dashboards. Plan for instructor-led classes, live demos, and recorded sessions so they can revisit the material later.
Deliverables:
• Fully functional Oracle P6 EPPM instance that passes user-acceptance testing
• Complete documentation pack (admin guide, user guide, training deck) in Arabic and English
• Two days of advanced, cost-control–focused training plus follow-up Q&A support
If you have proven P6 EPPM implementation experience in the engineering or construction sectors, can communicate fluently in Arabic, and can begin within the next two weeks, I’d like to review your approach and sample documentation. Let’s make this rollout a success.