Network Administration (Please place bid after review project description)
Budget: $30 – $250 USD
required to build, document, and demonstrate a TCP/IP network, configured with essential network services and additional enhancements.
Criteria for assessment:
1. The network and its services work as intended
2. The report documents the system and indicates a correct understanding of how the network components fit into the whole.
3. Presentation of work-in-progress and project management
Maximum points for an enhancement will only be achieved when it is successfully implemented (criteria 1) and properly documented (criteria 2). A template for reporting on each enhancement is provided. Note that all screenshots must include the student ID number of the owner in the hostname, email address, or logfile entries.
Criteria for assessment:
1. The network and its services work as intended
2. The report documents the system and indicates a correct understanding of how the network components fit into the whole.
3. Presentation of work-in-progress and project management
Maximum points for an enhancement will only be achieved when it is successfully implemented (criteria 1) and properly documented (criteria 2). A template for reporting on each enhancement is provided. Note that all screenshots must include the student ID number of the owner in the hostname, email address, or logfile entries.