Upgrade Moodle 3.2 to 3.9
Budget: $30 – $250 USD
An upgrade of Moodle v3.2 to v3.9 is required with a hop version v3.6 according to Moodle HQ.
The current version of php is 5.6 which needs to be upgraded to 7.1 (for Moodle36) then to 7.3 (for Moodle 39).
The current version of MySQL is on 5.7 which doesn't need to be upgraded.
The current version of php is 5.6 which needs to be upgraded to 7.1 (for Moodle36) then to 7.3 (for Moodle 39).
The current version of MySQL is on 5.7 which doesn't need to be upgraded.