Microsoft Project Construction Schedule
Budget: £20 – £250 GBP
I already have a basic construction programme in Microsoft Project; what I need now is for someone to bring it to life. The file contains only task headings, so your job is to add sensible start- and finish-dates, apply realistic durations, and create true logical links so the entire schedule flows the way a construction site actually operates.
The scope is limited to construction and installation activities—no design, planning, or procurement phases. I’m looking for moderate detail: each main activity should stand on its own line with the essential predecessors and successors connected, but I don’t want to dive into dozens of tiny sub-tasks. Think practical site-level headings such as groundworks, superstructure, MEP first-fix, finishes, commissioning, handover, and similar.
Deliverables that will let me sign off quickly:
• A cleaned-up .mpp file with all construction and installation tasks dated and linked.
• Critical path visible and a quick note (inside the file or a short PDF) highlighting any key sequencing or float observations.
If you work daily in Microsoft Project and understand construction logic, this should be straightforward. Once I receive the updated file I can review immediately and turn around feedback the same day, so we can wrap the job fast.
The scope is limited to construction and installation activities—no design, planning, or procurement phases. I’m looking for moderate detail: each main activity should stand on its own line with the essential predecessors and successors connected, but I don’t want to dive into dozens of tiny sub-tasks. Think practical site-level headings such as groundworks, superstructure, MEP first-fix, finishes, commissioning, handover, and similar.
Deliverables that will let me sign off quickly:
• A cleaned-up .mpp file with all construction and installation tasks dated and linked.
• Critical path visible and a quick note (inside the file or a short PDF) highlighting any key sequencing or float observations.
If you work daily in Microsoft Project and understand construction logic, this should be straightforward. Once I receive the updated file I can review immediately and turn around feedback the same day, so we can wrap the job fast.