Engineering Project Database
Budget: $5,000 – $10,000 USD
We need a database developed to track and tally Electrical and Utility loads for our manufacturing facilities. This database will be used to track the total loads for the plant as well as loads by room, by area, by production line and each connection. We will also list our equipment and control panels among other information.