I need a consultant to assess installation of heat pump in my unit
Budget: $250 – $750 NZD
Heat pump has to be installed in my unit - 205/20 Upper Queen St., Auckland Central. The tube for gas and power cables will run over timber wall under the canopy. There will be not be any penetrations to the monolithic cladding.
Body Corporate does not allow heat pump as they think piping penetrations will be over the monolithic cladding. I need an exemption so a heat pump can be installed.
Body Corporate does not allow heat pump as they think piping penetrations will be over the monolithic cladding. I need an exemption so a heat pump can be installed.