manufacture of a parallel jaw vice
Budget: $30 – $250 USD
Break down the job into a series of tasks, determine the skill requirements to complete these tasks and research
production costs. To organise the manufacture of a parallel jaw vice (or similar) from the drawings
provided. The material to be used is low carbon steel.
production costs. To organise the manufacture of a parallel jaw vice (or similar) from the drawings
provided. The material to be used is low carbon steel.