The project scope is to build a new Sulfuric Acid Plant (SAP). You will have to provide the detail design study for OSBL that has been developped in the previous phase.
At the end of phase, it is expected to provide a complete solution that will allow reaching the project goal. That includes a complete set of P&IDs, Datasheet of Mechanical equipment and drawings.
The OSBL
o o o
Piping:
• Plot Plan Optimization:
Review the arrangement of Equipment and suggest options for improvement.
• Piping Material Specification Update (Complete one Piping class specification):
Finalize the PMS BB3 Pipe class by calculating the thickness of the pipe. Select valve, body and trim material of construction.
o o o
Mechanical:
• Technical Bid Analysis:
o Design of tank foundation
o Developverificationsrequiredforensuringexternalstabilityoftankfoundation
To fill a TBA sheet, which gathers all technical information and the scope of supply of query, requested to make a technical bid evaluation (TBE). During the TBE phase, the requisition
engineer fills the information from the bidder documents to facilitate the comparative analysis between bidders.
• Completed Equipment Datasheets:
To complete Equipment Datasheets with the missing Mechanical information
• Completed Equipment Drawings:
To complete drawing which summarizes the equipment parameters (performance data, connection information, general notes, elevation view, thicknesses, dimensions, foundations, material of construction...)
Contact me for further informations
At the end of phase, it is expected to provide a complete solution that will allow reaching the project goal. That includes a complete set of P&IDs, Datasheet of Mechanical equipment and drawings.
The OSBL
o o o
Piping:
• Plot Plan Optimization:
Review the arrangement of Equipment and suggest options for improvement.
• Piping Material Specification Update (Complete one Piping class specification):
Finalize the PMS BB3 Pipe class by calculating the thickness of the pipe. Select valve, body and trim material of construction.
o o o
Mechanical:
• Technical Bid Analysis:
o Design of tank foundation
o Developverificationsrequiredforensuringexternalstabilityoftankfoundation
To fill a TBA sheet, which gathers all technical information and the scope of supply of query, requested to make a technical bid evaluation (TBE). During the TBE phase, the requisition
engineer fills the information from the bidder documents to facilitate the comparative analysis between bidders.
• Completed Equipment Datasheets:
To complete Equipment Datasheets with the missing Mechanical information
• Completed Equipment Drawings:
To complete drawing which summarizes the equipment parameters (performance data, connection information, general notes, elevation view, thicknesses, dimensions, foundations, material of construction...)
Contact me for further informations