Design bridge in Ansys workbench
Budget: $30 – $250 USD
design a structure (Bridge) in Ansys Workbench in such a way as to maximize the largest possible load (in N) that it can support without failure. The load is applied to the center of the bridge. This bridge line model design is subject to the constraints described below, some of which are shown in Figure