Calculate Drag and Pulling Requirements for a 48" HDPE Pipe into a 60" Concrete Pipe

Job ID: 30988458

Budget: $10 – $3,000 USD

We are lining a 60" concrete pipe outfall with 250' of 48" HDPE pipe. The existing pipe outlet is at the bank of a river. We will weld up the pipe including a cap on one end that will be used for a pulling head and a SS ring flange on the other end with an HDPE blind bolted on. We will then place the 48" pipe into the river connected to a tug boat that will pull it up the river. We will attached a cable that has been threaded through the 60" concrete pipe to the pulling head and pull the pipe into place. The pipe will have skids attached also. I need to show the drag calculations to the owner and I need to know how much pulling force will be required to pull it into place. Full plans, specs and submittals are available upon request.